Industrial Oil-Cooled Transformers
Oil-immersed power transformer is an electrical appliance that adopts insulating oil as insulating medium and is composed of iron core, coil, regulator switch, oil tank, etc. to change voltage and transmit AC energy, featuring small volume, cheap price and strong weather resistance.
Product Details:Industrial Oil-Cooled Transformers
Chief among the advantages of oil-immersed transformers are their efficiency in energy usage and savings, accompanied by excellent insulation qualities and reliability. The insulating oil within the transformer acts as a robust barrier, efficiently isolating the windings and preventing the occurrence of arcs, discharges, and other malfunctions. It also regulates temperatures, averting overheating and thereby prolonging the transformer's service life.
PARAMETER:
Model | Rated Capacity | Typical voltage combinations (kV) | Linkage group labeling | Impedance Voltage | Total weight | Transportation weight | Reference Size(mm) | No-load loss | Load Loss |
S(F)Z11-6300/35 | 6300 | oppressive H.V.35~38.5 | YNd11 | 8 | 18 | 13 | 4000*3300*3100 | 5.63 | 36.7 |
S(F)Z11-8000/35 | 8000 | 21 | 16 | 4200*3400*3300 | 7.87 | 40.6 | |||
S(F)Z11- | 10000 | 23 | 17 | 4300*3500*3500 | 9.28 | 48 | |||
S(F)Z11- | 12500 | 28 | 21 | 4800*3500*3700 | 10.71 | 56.8 | |||
S(F)Z11- | 16000 | 33 | 24 | 5000*3800*3800 | 13.1 | 70.3 | |||
S(F)Z11- | 20000 | 38 | 29 | 5300*4000*4000 | 15.5 | 82.7 | |||
S(F)Z11- | 25000 | 10 | 43 | 33 | 5500*4200*4100 | 18.3 | 97.8 | ||
S(F)Z11- | 31500 | 50 | 39 | 5800*4400*4300 | 21.8 | 116 |
1. Pre-installation preparation
Work time quota: (according to the national quota standard) the comprehensive work days required for the installation of the body is 21 work days.
Work includes: unpacking inspection, the body in place, body inspection, casing, oil pillow and radiator cleaning, etc., oil column test, accessory installation, pad iron and stop wheel production and installation, supplementary column and installation of the overall sealing test, grounding, fill paint, etc..
Transformer in the installation process whether need to dry, inspection and judgment to determine, need to dry, with the iron loss drying method when drying after the work days required for 20 days, oil filtration work days required for 3.38 work days / ton.
Debugging work days required to be calculated separately.
2. Prevention of oil leakage:
Oil-immersed transformer in the tank is filled with transformer oil, the assembly relies on fasteners on the oil-resistant rubber components pressurized and sealed. Poor sealing is the main reason for transformer oil leakage, so in the maintenance and repair should pay special attention.
Whether the small bolt after vibration and loose, if loose should be tightened solid, tighten the degree should be appropriate, and should be consistent everywhere. Whether the rubber is broken or deformed seriously. This can be updated rubber parts, replacement should pay attention to its model specifications are consistent, and keep the sealing surface clean.
CASES
Own Factory
Employees at Working
Transportation
SERVICE
Information Technology Support
We provide IT solutions such as automated processing systems, tracking and positioning systems, and data analytics tools.These systems enable clients to better manage their logistics operations, improving efficiency and accuracy.
Teamwork and mutual growth
We believe that only by uniting can we overcome all difficulties. Our corporate culture advocates teamwork and encourages employees to support and learn from each other. We regularly organize team building activities to enhance team cohesion and jointly contribute to the development of the enterprise.
FAQ:
Q: What are the initial steps for entering a partnership agreement with you?
A: As an initial step, please send us a message from the website stating your intention to partner with us. We'll then arrange a meeting to discuss the terms and conditions of our partnership.
Q: Can we sign a long-term contract?
A: Of course, we are very willing to sign a long-term contract with you to ensure the stability and continuity of our cooperation. The specific terms of the contract can be determined according to the needs and negotiations of both parties.
Q: How to reduce the risk in international trade?
A: International trade does have certain risks, but we can take some measures to reduce the risks. For example, choosing reliable logistics partners, conducting sufficient market research and risk assessment, and signing detailed contracts. We will work closely with you to address potential risks and challenges.






