Oil Immersed Hermetically Sealed Type Transformer
Oil-filled transformers, pivotal in power transmission and distribution systems, are renowned for their superior heat dissipation capabilities. Employing premium insulating oil as a cooling agent, they efficiently mitigate operational temperature spikes, enhancing both equipment stability and longevity, thereby serving as a vital safety shield in extensive power grid infrastructures.
Product Details:Oil Immersed Hermetically Sealed Type Transformer
Celebrated for their remarkable energy transformation capabilities, oil-immersed transformers hold sway in the power domain. Engineered with precision, they effortlessly convert input power to the desired voltage level, prevalent across power stations, substations, and industrial power setups, facilitating the streamlined utilization and transfer of energy.
PARAMETER:
Model | OSFPZ-300000/400 | OSFPSZ-315000/400 | SFZ-4380000/420 |
Capacitance ratio (MVA) | 300/300/100 | 315/315/105 | 438/438 |
Ratio-voltage (kV) | 400±8×1.25%/115/10.5 | 400±8×1.25%/220/33 | 420(-10,+6)×1.25%/20 |
voltage regulation mode | Variable magnetic flux | Constant magnetic flux | Constant magnetic flux |
Open circuit losses (kW) | 78.01 | 55.96 | 149.56 |
Load losses (kW) | 581.95 | 430.88 | 779.93 |
Impedance voltage (%) | 14.3 (High-Medium) | 12.5 (high-medium) / 45 (high-low) / 30 (medium-low) | 14.31 |
Oil oil temperature rise (K) | 37.1 | 34.2 | 30.7 |
Maximum Winding temperature rise (K) | 56 | 47.3 | 47.5 |
No-load noise (dB (A)) | 64.7 | 60 | 67 |
Measured local level (pC) | 80 | 100 | 90 |
1. Preparation for Installation
Optimally, power transformer overhaul and assembly operations are undertaken within a designated overhaul facility. In cases where this is not feasible, a temporary installation location must be judiciously selected, preferably in close proximity to the transformer's base platform, to facilitate prompt positioning and installation. For outdoor setups, setting up tents is a wise choice. The temporary site should facilitate hassle-free transportation, possess flat, wide roads, and offer a solid, level, and dry ground. Moreover, it should be situated far from smoke outlets, water towers, and neighboring buildings, adhering to the necessary fire safety distance requirements.
2. Consider the installation environment and conditions
Installation space: according to the installation site space size and structure, select the appropriate transformer model and installation.
Environmental conditions: consider the temperature, humidity, altitude and other factors of the transformer installation environment, select the transformer model that can adapt to the environmental conditions.
Own Factory
Employees at Working
Transportation
Enterprise Culture
'Customer first' isn't a slogan confined to posters; it's a philosophy that governs our actions. We diligently attend to the demands of each customer, comprehend their aspirations, and strive to exceed them with our proficient services and premium products. For us, the pinnacle of achievement lies in delighting our customers, which also fuels our motivation.
Customer Reviews
"In Canada, we've found Haikun Petrochemical to be a reliable and knowledgeable partner. Their industrial lubricants have proven to be of superior quality, and their team's expertise has helped us optimize our machinery's performance. Highly satisfied!" — Canada, Sarah Wilson